The process of making metal badges.


Understand the badge making friends for the first time, often thought, make badge is a very simple process, in fact is not, badge production process is very complex, generally high quality need a longer time. Custom-made badges, it is recommended that you come to the consultation 15 days in advance, so that you have enough time to complete the badge production, or when you want to use it, the badge is not finished yet. As for the insignia process, the following details are analyzed below:
Badges are generally divided into the following seven stages:
1. Put your ideas or your LOGO made of astronomy, or by factory technical drawings for members to complete the drawings, and finally confirmed by the customer, after confirmed by production can be formal, this stage need about 1 to 2 days time.
2. To make sketches of a black and white, with black and white said convex metal, put in black and white pattern, in this paper, the engraving machine carved into the mold, and mold in hot oil to heat treatment, mold hardness greatly ascend. This completes the mold production, which takes 2 days.
3. Put the mould pressure on the machine by pressing, the mold design, to 1 mm thick copper plate and the surface of the iron sheet, the embryonic form of products, depending on the number of, usually also need 1 to 2 days to complete.
4. The copper sheet and the product design on the iron sheet, according to the shape of the shape, stamping down on punching machine, form a complete product, and for deburring, polishing, electroplating and other processes, also need to 1-2 days time.
5. After the plating, according to the regulations of the number of color on image, color, and color, each color, all need drying, and then on to the second color, general badge should be 3-4 color, after all the color, also need to color and high temperature curing, color is complete, need to add the resin layer in order to protect the paint is not damaged, also need drying curing resin layer, this process takes 1 to 2 days time.
6. Quality inspection, packing, takes 1 day.
7. It will take 1-2 days for you to express.